| Project Name | Xayaburi |
| Status | Operational |
| River | Mekong |
| Sub-basin | Mekong mainstream |
| COD | 2019 |
| Capacity (MW) | 1285 |
| Annual Gen. (GWh) | 7370 |
| Dam Type | Run-of-river concrete barrage |
| Height (m) | 32.6 |
| Turbine Type | Kaplan reaction |
| Turbine Configuration | 8 × 7×175 + 1×60 MW |
| Spillway Type | 10 × radial gates |
| Spillway Cap. (m³/s) | 3980 |
| Owner & Shareholders | CK Power PCL 42.5%, Natee Synergy 25%, EDL-Gen 20%, Electricity Generating 12.5% |
| Customer | EGAT & Électricité du Laos |
| Website | http://www.xayaburi.com/index_eng.aspx |