| Project Name | Houay Por |
| Status | Operational |
| River | Houay Por and Xeset |
| Sub-basin | Xeset |
| COD | 2018 |
| Capacity (MW) | 15 |
| Annual Gen. (GWh) | 60 |
| Dam Type | Diversion dam |
| Height (m) | 64 |
| Turbine Type | Horizontal Francis |
| Turbine Configuration | 2 × 5 MW + 2 × 2.5 MW |
| Spillway Type | Concrete overflow |
| Owner & Shareholders | Huai Por Power Co., Ltd. |
| Customer | EDL |