| Project Name | Nam Theun 1 |
| Status | Operational |
| River | Nam Theun |
| Sub-basin | Nam Theun |
| COD | 2022 |
| Capacity (MW) | 650 |
| Annual Gen. (GWh) | 2500 |
| Dam Type | Balancing reservoir |
| Height (m) | 56 |
| Turbine Type | Francis |
| Turbine Configuration | 4 × 162.5 MW |
| Spillway Type | Radial gates |
| Spillway Cap. (m³/s) | 8000 |
| Owner & Shareholders | EGCO 60%, Ratch 40% |
| Customer | EGAT & Électricité du Laos |
| Website | https://www.namtheun1.com/ |