| Project Name | Nam Che 1 |
| Status | Operational |
| River | Nam Che |
| Sub-basin | Nam Che |
| COD | 2019 |
| Capacity (MW) | 16.8 |
| Annual Gen. (GWh) | 68.4 |
| Dam Type | Run-of-river |
| Turbine Type | Francis |
| Turbine Configuration | 2 × 8.4 MW |
| Owner & Shareholders | B.Grimm Power Co. Ltd., Daosavanh Co. Ltd. |
| Customer | EDL |