| Project Name | Nam Theun 2 |
| Status | Operational |
| River | Nam Theun → Xe Bang Fai |
| Sub-basin | Nam Theun |
| COD | 2010 |
| Capacity (MW) | 1075 |
| Annual Gen. (GWh) | 4500 |
| Dam Type | Reservoir dam |
| Height (m) | 39 |
| Turbine Type | Francis |
| Turbine Configuration | 4 × 268.75 MW |
| Spillway Type | Gated overflow |
| Spillway Cap. (m³/s) | 11000 |
| Owner & Shareholders | EDF 40%, EGCO 35%, EDL-Gen 25% |
| Customer | EGAT & Électricité du Laos |
| Website | https://www.namtheun2.com/ |